Renovation alert: Basement floor 1 Below (till May 2018)

Please be advised that that an area of the basement will be undergoing maintenance and renovations, starting the week of Nov 27 till May 2018.

Electrical and mechanical work will take place during this time in 1 Below (south end beside ramp leading to level 3 of the journal stacks).  Please note that the study carrels in this area have been relocated to our Quiet Study Area and the 2nd floor (by the DSCILab).

During this time period, there may be some additional noise:  

  • To find an alternate quiet area, please refer to our Quiet Study Spaces page or consult our floorplans.
  • Earplugs are also available upon request at our Loans Desk, or headphones can also be borrowed from our Short Term Loans Desk.

We thank you for your understanding and patience during this time.